Operating Weight: 7000kg, 7 Tons
Engine Power: 58.8 kw
Bucket Capacity: 0.2 - 0.3 m³
Tail Swing Radius: 1820 mm
Walking Speed: 25 km/h
Grade Climbing ability: 30 °/58%
Max Traction Force: 45 KN
Max Digging Reach: 6400 mm
Max Digging Depth: 3300 mm
Max Digging Force: 45 KN
Max Dumping Height: 4860 mm
| Range of operation |
| Boom length |
3300mm |
| Arm length |
1850mm |
| Max. digging reach |
6400mm |
| Max. digging depth |
3300mm |
| Max. digging force |
45KN |
| Max. dumping height |
4860mm |
| Back-end radius of gyration |
1820mm |
| Dimensions |
| (Length*width*height) Transport dimensions |
5800*2100*2850mm |
| Axle base |
2400mm |
| Ground clearance of counterweight |
1060mm |
| Min. ground clearance |
285mm |
| Tech performance and specification |
| Angle of rotation |
360° |
| Machine weight |
7000kg |
| Engine model |
YUNNEI(National Stage III) |
| Rated power |
58.8KW |
| Rated speed |
2200r/min |
| Hydraulic system working pressure |
20Mpa |
| Hydranlic system flow |
110L/min |
| Metering gear pump |
2*25ml/r(Gear Pump) |
| Max. Traction force |
45KN |
| Walking speed |
25km/h |
| Grade climbing ability |
58%/30° |
| Tyre model |
7.50-16 |
| Volume of bucket |
0.2-0.3m3 |
| Swing overload pressure |
20Mpa |
| Full circle swinging time |
5.5s |
| Fuel quantity |
≥4L/h |
| Fuel tank capacity |
110L |
| Hydraulic oil tank capacity |
110L |
